West Mecklenburg High School

SCOPE OF WORK
Renovate/replace gymnasium built in 1954.

PROGRESS
The West Mecklenburg High School Gym (17) construction manager continues with load bearing masonry for the gymnasium. The concrete floor slabs have been poured at the lobby and locker rooms and the structural steel bar joist will follow as areas are prepared. The below grade piping is completed in most of the building. The recent rains have kept the gym floor area wet, so focus will be on getting this area dried out for floor slab installation. The site contractor has completed most of the below grade storm water piping.

UPDATED
January 2021
Construction Manager /
General Contractor
Barnhill/D.A. Everett
Architect
Moseley Architects
Location
7400 Tuckaseegee Road Charlotte, NC 28214
Overall Budget
$10,850,902
Project Manager
Chip Lofton
Construction Percent Complete
28%
Occupy On
August 2021
Board District
District 2