New 100 classroom school to replace current facility built in 1954.
PROGRESS
The West Charlotte High School (17) construction manager continues with load bearing masonry and the installation of structural steel framing. Roof joists have been set in some areas allowing roofing to start. The in-wall rough-ins continue as walls are placed and above ceiling rough-ins for mechanical and electrical have started. The plumber has also been busy with sanitary sewer and supply piping. The athletic buildings are also progressing with load bearing masonry walls. The site contractor is preparing the parking lot area for paving.