New High School (Olympic Relief)

SCOPE OF WORK
New 100 classroom high school; relieves crowding at Olympic High School.

PROGRESS
The construction manager for the New High School Olympic Relief (17) structural steel for the East classroom building was constructed. The concrete slab was poured for the West classroom wing. Exterior metal studs were started on the administration building. The roof system was started on the kitchen/cafeteria building. Overhead rough-ins continued in areas that became available. The sitework contractor graded the staff/visitor lot and began stone base installations. The stadium concrete retaining wall footings were installed with the vertical wall started. The 100-classroom relief high school is scheduled to be occupied in August 2022.

UPDATED
January 2021
Construction Manager /
General Contractor
Edifice
Architect
Little Diversified Architectural
Location
14947 York Road Charlotte, NC 28278
Overall Budget
$109,908,793
Project Manager
Ken Brown
Construction Percent Complete
34%
Occupy On
August 2022
Board District
District 2