SCOPE OF WORK
New K-8 Language Immersion facility located on the old Nations Ford Elementary School site.

PROGRESS
The construction manager for the New K-8 Language Immersion South (17) received temporary dry-in in the administration area and drywall installation has proceeded in this area. The final slab on deck was poured and the structural steel for mechanical mezzanine was installed. Metal stud installation continued in the first floor classroom wing. The brick mason continued the installation of the exterior brick veneer and interior masonry. MEP trades worked throughout the entire building installation above ceiling and in-wall rough-ins. The site work contractor continued with final grading operations of the roads and fields in preparation of the remaining storm structures.

UPDATED
June 2020
Construction Manager /
General Contractor
Messer Construction (CM)
Architect
FWA
Location
8300 Nations Ford Road Charlotte, NC 28217
Overall Budget
$42,959,367
Project Manager
Kenneth Brown
Occupy On
August 2021
Board District
District 2